Engineering Services |
Williams Alaska PetroleumCrude Unit 1 Debottlenecking![]() North Pole, Alaska Class 30 cost estimate, scheduling, and detailed design for crude unit 1 debottleneck to increase capacity to 51,000 bbl/day. The expansion involved modifications to six different areas in the crude unit, including:
Naphtha Fuel Storage and LoadingNorth Pole, Alaska Increase gasoline production by procesing all the overhead liquid from both crude units. Increased the depropanizer capacity and naphtha extraction capacity. Piping Stress Analysis - Debutanizer ReboilerNorth Pole, Alaska Refinery process piping stress analysis services. Rapid turnaround stress analysis of 20-inch reboiler exit line following field modification. Piping Stress Analysis - Debutanizer ReboilerNorth Pole, Alaska Refinery process piping strees analysis services. Rapid Turnaround stress analysis of 20-inch reboiler exit line following field modification. Crude Unit 1 Debottlenecking![]() North Pole, Alaska Class 30 cost estimate, scheduling, and detailed design for crude unit 1debottleneck to increase capacity to 51,000 bbl/day. The expansion involved modifications to six different areas in the crude unit, including a new parallel crude heater, pressure drop modifications to the ARC system, modifications to the crude charge system, modifications to product rundown systems, piping modifications to overhead liquid and vapor systems, and major motor control center modifications. Naphtha Fuel Storage and LoadingNorth Pole, Alaska Increase gasoline production by processing all the overhead liquid from both crude units. Increased the depropanizer capacity and naphtha extraction capacity. |