Winstar Petroleum / Oliktok Petroleum LLC

Oliktok Point State No. 1 Production Tie-In Design

Kuparuk River Unit, North Slope, Alaska

Detailed Design document preparation for tie-in of production from Winstar's first exploration/production well within the expanded Kuparuk River Unit. Scope included high pressure pipe routing, instrumentation, and electrical connection details for tie-in of field mounted instrumentation to existing DCS. Designed to ConocoPhillips Alaska Inc. (CPAI) engineering standards, with review and approval by CPAI engineering, construction and operations staff.